Akpan, E O P and Igwe, O (2001) Methodology for Determining Price Variation in Project Execution. Journal of Construction Engineering and Management, 127(05), 367–73.

Chevallier, N J and Russell, A D (2001) Developing a Draft Schedule Using Templates and Rules. Journal of Construction Engineering and Management, 127(05), 391–8.

El-Diraby, T E and O'Connor, J T (2001) Model for Evaluating Bridge Construction Plans. Journal of Construction Engineering and Management, 127(05), 399–405.

  • Type: Journal Article
  • Keywords:
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)0733-9364(2001)127:5(399)
  • Abstract:
    Effective planning has considerable influence on the successful completion of a bridge project, particularly with respect to minimizing effects on traffic flow, safety, and adjacent business activity. The optimization of such plans is, hence, desirable. However, designers lack objective tools with which to evaluate the effectiveness of their plans. This paper presents a model for evaluating bridge construction plans during the design phase. The model includes five major factors: safety, accessibility, carrying capacity, schedule performance, and budget performance. An additional 22 subfactors were developed to assist in evaluating these major factors. The model was developed based on observation of actual construction sites and through input from industry experts. It was validated through input from another set of industry experts and application to an actual bridge construction planning case.

Elinwa, A U and Joshua, M (2001) Time-Overrun Factors in Nigerian Construction Industry. Journal of Construction Engineering and Management, 127(05), 419–25.

Henry, E and Brothers, H S (2001) Cost Analysis between SABER and Design Bid Build Contracting Methods. Journal of Construction Engineering and Management, 127(05), 359–66.

Kang, L S, Park, I C and Lee, B H (2001) Optimal Schedule Planning for Multiple, Repetitive Construction Process. Journal of Construction Engineering and Management, 127(05), 382–90.

Seo, S and Hwang, Y (2001) . Journal of Construction Engineering and Management, 127(05), 414–8.

Thorpe, T and Mead, S (2001) Project-Specific Web Sites: Friend or Foe?. Journal of Construction Engineering and Management, 127(05), 406–13.

Yamín, R A and Harmelink, D J (2001) Comparison of Linear Scheduling Model (LSM) and Critical Path Method (CPM). Journal of Construction Engineering and Management, 127(05), 374–81.

Zhang, X Q and Kumaraswamy, M M (2001) Procurement Protocols for Public-Private Partnered Projects. Journal of Construction Engineering and Management, 127(05), 351–8.